During the summer months, there will be a significant presence of construction vehicles on our campus and traffic will be two way at the back of the school while site work is underway around the front of the current high school. The Temporary Main Entrance will be near the chorus room at the back of the building. If you need to come to the high school this summer, please plan for extra time and look for signage to support you as you move about campus. It is imperative that we all drive very carefully when we are on the high school campus this summer. |